117 Park Place • Point Richmond, CA • 94801 • ✉️ • info@intres.com • 510-236-7435
Forensic Investigation / Waterproofing
LOCATION
Healdsburg, California
TYPE
Education, K-12
CLIENT
Healdsburg Unified School District
PROJECT TEAM
Masoomeh Sharifi-Soofiani
Michael T. Tran
Thomas K. Butt
PROJECT COLLABORATORS
GENERAL CONTRACTOR
FRC, Inc.,
SUBCONTRACTORS
Simpson Gumpertz & Heger, Intertek
The Fitch Mountain Elementary School was suffering from water damage. The Healdsburg Unified School District retained Interactive Resources, Inc. to provide forensic architectural and engineering services for the repair design of the extensive water damage at the school campus. Our scope of work included: an existing conditions survey and preparing a schematic design, design development, construction documents, specifications, cost estimate and DSA and agency approval for reconstructing portions of the walls, glazing and roofs to repair leaks.
In addition, the project included the addition of three canopy structures, recladding, and the storefront systems replacement at buildings A2 and D.