The City of San Carlos commissioned Interactive Resources to upgrade its existing twenty-year-old Youth Center to better reflect current programs and services. The Youth Center serves more than one hundred middle-schoolers, Monday through Friday, and is home to a wide...
Marin Center Facility Conditions Assessment
The County of Marin selected Interactive Resources to conduct a facility condition assessment (FCA) of its Civic Center campus in San Rafael, California, based on our expertise with similar projects — having performed hundreds of FCAs for the public and private...
Applied Technology Building Infrastructure Upgrades – College of the Redwoods
As part of a campus-wide utility infrastructure modernization project at the College of the Redwoods, Interactive Resources is providing an upgrade of student shops and lab areas, support offices, classrooms and restrooms in the Applied Technology Building. The scope...
Franchise Tax Board Forensic Investigation
As part of an IDIQ contract for forensic architecture and engineering services for the State of California, DGS, Interactive Resources conducted a forensic investigation of ongoing water intrusion at two locations on the Franchise Tax Board campus. The water intrusion...
Fitch Mountain Elementary School Water Intrusion Investigation & Repairs
The Fitch Mountain Elementary School was suffering from water damage. The Healdsburg Unified School District retained Interactive Resources to provide forensic architectural and engineering services for the repair design of the extensive water damage at the school...
Student Union Infrastructure Upgrades – College of the Redwoods
As part of the campus-wide utility infrastructure project at the College of the Redwoods, Interactive Resources is providing architectural design services for the upgrade of the Student Union’s dining area, bookstore, food sales area, and restrooms. Interactive...