AC Transit’s Line 97 route is 13 miles and extends from the Bay Fair Bay Area Rapid Transit (BART) station to the Union Landing Transit Center. Line 97 is one of the 11 high ridership routes in the service area, and the project represents a critical investment in the...
BART – Lake Merritt Plaza Waterproofing
The Lake Merritt Station was constructed around 1967, some 53 years ago. The underground station lies under parts of two city blocks, bounded by Madison and Fallon Streets and 8th and 9th Streets. The west block, bounded by Madison and Oak Streets and 8th and 9th...
BART – Train Control Rooms Water Intrusion Investigation Mitigation
Interactive Resources, Inc. was the project architect contracted as a subconsultant to the prime consultant to BART, Kwan Henmi to investigate water intrusion into BART Train Control rooms from rain. An investigation was conducted and a report was prepared describing...
BART – Water Intrusion Investigation
Beginning in 2007, Interactive Resources, Inc. was retained as part of a team composed of Jacobs Engineering, BART staff and consultants to quantify, categorize, strategize and conduct field investigations for water penetration of both building envelopes and...
BART – Powell Street Waterproofing
In 2016, BART successfully completed an extensive remedial waterproofing project at the concrete ceiling of the Mezzanine Level of the Powell Street BART Station. Tom Butt of Interactive Resources, Inc. was the project architect contracted as a subconsultant to the...
AC Transit Customer Service Center Remodel
Interactive Resources, Inc. was awarded an On-Call Architectural and Engineering contract from the Alameda-Contra Costa Transit District (AC Transit). As part of this contract, Interactive Resources, Inc. remodeled the AC Transit Customer Service Center located on the...