Interactive Resources, Inc. was retained by Sunterra Solar to provide structural engineering services or a new solar canopy to be located atop the new parking garage facilities at the City of Lake Forest Civic Center in Lake Forest, California. Structural engineering...
Foothill Transit District – Covina Transit Center Park & Ride Solar Carport
Interactive Resources, Inc. was retained by Sunterra Solar to provide structural engineering services for a new solar canopy to be located atop the new parking garage facilities at the Covina Transit Center Park and Ride located in Covina, California. Structural...
Federal Trade Commission Tenant Improvement
Interactive Resources, Inc. provided architectural design and engineering services for office and conference space remodels at the U.S. Federal Building in San Francisco. The tenant improvements are for the Federal Trade Commission, who will occupy space on the 3rd...
AC Transit – Line 97 South County Major Corridor Transit Performance Initiative (TPI) Project
AC Transit’s Line 97 route is 13 miles and extends from the Bay Fair Bay Area Rapid Transit (BART) station to the Union Landing Transit Center. Line 97 is one of the 11 high ridership routes in the service area, and the project represents a critical investment in the...
BART – Lake Merritt Plaza Waterproofing
The Lake Merritt Station was constructed around 1967, some 53 years ago. The underground station lies under parts of two city blocks, bounded by Madison and Fallon Streets and 8th and 9th Streets. The west block, bounded by Madison and Oak Streets and 8th and 9th...
BART – Train Control Rooms Water Intrusion Investigation Mitigation
Interactive Resources, Inc. was the project architect contracted as a subconsultant to the prime consultant to BART, Kwan Henmi to investigate water intrusion into BART Train Control rooms from rain. An investigation was conducted and a report was prepared describing...