Interactive Resources, Inc. has provided design services for a wide array of projects for the University of California, Berkeley over the course of the last two decades. Services performed include architectural design, seismic analysis/retrofits, mechanical and...
University Hall Envelope Improvements
University Hall, designed by Welton Becket and Associates and constructed in 1959, is a large concrete-frame high-rise building that houses administrative offices for the University of California, Berkeley. The structure is composed of a seven-story tower and an...
Marin Center Facility Conditions Assessment
The County of Marin selected Interactive Resources, Inc. to conduct a facility condition assessment (FCA) of its Civic Center campus in San Rafael, California, based on our expertise with similar projects — having performed hundreds of FCAs for the public and private...
Applied Technology Building Infrastructure Upgrades – College of the Redwoods
As part of a campus-wide utility infrastructure modernization project at the College of the Redwoods, Interactive Resources, Inc. played a pivotal role in improving access and ailing systems within the Applied Technology Building. This included upgrading student...
Franchise Tax Board Forensic Investigation
As part of an IDIQ contract for forensic architecture and engineering services for the State of California, DGS, Interactive Resources, Inc. conducted a forensic investigation of ongoing water intrusion at two locations on the Franchise Tax Board campus. The water...
Fitch Mountain Elementary School Water Intrusion Investigation & Repairs
The Fitch Mountain Elementary School was suffering from water damage. The Healdsburg Unified School District retained Interactive Resources, Inc. to provide forensic architectural and engineering services for the repair design of the extensive water damage at the...