<PG&E’s Browns Valley Energy Storage Facility

Utility-Scale Battery Energy Storage System / Civil and Structural Engineering

PG&E’s Browns Valley Energy Storage Facility

LOCATION
Browns Valley, California

TYPE
Solar

CLIENT
Cupertino Electric Inc.

PROJECT TEAM
Paul Westermann

Interactive Resources, Inc. provided civil and structural engineering services for the Browns Valley Energy Storage Equipment Anchorage project located in Browns Valley, California and built by Cupertino Electric, Inc. This is PG&E’s first lithium-ion storage system that paves the way for future multi-use deployments and it is the first time a Tesla energy storage system has been fully integrated into a utility SCADA system.

Interactive Resources, Inc. was commissioned by Cupertino Electric, Inc. to provide structural calculations and the design and preparation of structural details for the anchorage and concrete pads for new switchgear, transformers, inverters, battery storage racks and related electrical equipment and civil services for site grading. To read more about this project, click here.

Photos courtesy of Cupertino Electric, Inc.

© Cupetino Electric, Inc.

117 Park Place • Point Richmond, CA • 94801 •  • info@intres.com • 510-236-7435