Napa First United Methodist Church Rehabilitation

Sep 8, 2017

The First United Methodist Church, built in 1917, was significantly damaged in the 2014 Napa earthquake. Interactive Resources, Inc. was selected to join the design-build team led by Pullman SST, Inc. and provide historic architectural design services for both exterior and interior repairs.

Working in conjunction with Kwan Henmi Architects, Interactive Resources, Inc. prepared existing conditions documentation, design development, construction documents, specification review, and construction administration services for this project. The project scope of work included: structural, electrical and acoustical upgrades; window repair; waterproofing; re-roofing; plaster and concrete repair; and interior finish and ornament repair. The completed project won a 2016 Excellence Award from the Northern California Chapter of the National Electrical Contractors Association.

117 Park Place • Point Richmond, CA • 94801 •  • info@intres.com • 510-236-7435